Situated on the Firth of Clyde, Hunterston PARC has access to some of the deepest waters of any port in the UK, able to accommodate draught of 35m.
Capabilities at the site include: vessel access alongside and beam, availability for anchorage for floating foundations, current and future cranage, quayside strength, extensive load-bearing laydown and assembly area, pontoon space and possibilities for modular construction.
With extensive redevelopment pipeline now in place, Hunterston could easily become a global centre for offshore wind turbine fabrication and assembly.